Tuesday, November 5, 2013

Eastern Washington Columnar Basalt ( 1 / 48" scale)

Building a road for vehicles into town

I am almost done with the dirt road that was added for vehicles to come into town from the upper level. The next stage will be to put the tire ruts and erosion to the road surface.

New Road to Town!

A new road for vehicles was added today. Soon the erosion and ruts will be added to the road top.