On30 Gauge (another view so far)


Here are two other views of the plaster rockwork for the upper level layout. Composed mostly of huge plaster castings of rock and broken and carved to fit. A filler material was used to join the castings together somewhat seamlessly. Note the vertical line in the mountains. This is where the mountains will separate when the layout needs to be relocated. The line will have a rip cord which will be covered over with water soluable filler and painted to match the rest of the scenery. The area can be wetted and the filler will let loose of the rip cord. This is another great idea that Dave Hikel had.

Comments