Posts

Showing posts from 2010

Upper Level Scenery begins

More views of Western Pacific line

Silverbow Canyon base painting complete

Applying a rocky edge to upper level of layout

More Static Grass Colors are Added

Color Matching / Silverbow Canyon Rock

Testing Various Static Grasses

Elevations being added / Scenery to come soon

Keddie Wye Area Of Model Railroad/ Base Scenery Prepared

Adding Static Grass to the dirt covered hills

Joshua Trees and Sagebrush Planted

Sanding complete around the On3 roadbed grade

Final Application of dirt from location / ready for static grass

Matching real rock color and patterns onto plaster and foam

Mountain base paint complete/ready for field grass/ballast and a river

Dusting real dirt onto scenery to blend into backdrop painting

More photos of Rugged Cascade range

Skykomish area gets base color treatment

More work on the upper tunnels

Todd and photo of new tunnels

More photos of the Clovis, AZ. area

More Views of the Clovis/Owenyo areas

Adding some base colors

Tunnel and interior and base paint / Owenyo, Ca.

Adding slopes against desert hills

Other side of the tunnel

Tunnel Rockwork

Steps in Ballasting track

Ballasting Track in the Railroad Yard

More foam building ahead

Removable scenery sections

Finishing up raw scenery in the Cascades

Hydrocal Gypsum Rock Castings for Tunnels and Mountains

A Small Stream is Carved

Skykomish is expanding with terrain

More Desert Scenes at Prescott

A Forest is planted on the narrow gauge section

Skykomish area gets texture

Final painting on the area near Prescott

Scenes across the deserts

Scene across New Mexico

Base colors get applied to the plateau's

The P&E Junction gets painted

The P&E Junction area as it is being carved out

Matching the color of actual soil

Before and After/ Cascade granite washes

Preparing for Cascade granite rock color washes

extending mountain range from the painted backdrop

stonework finished and ready for paint